Apr. 1957
The artificial radioactivity survey of the atmosphere nuclear test was started at the Fukui Prefectural Institute of Public Health(Shihiguchi, Fukui).
-
May. 1964
The advance research of the environmental radioactivity was started in the Tsuruga Peninsula and around the sea where was the planned construction site of a nuclear power plant.
-
Nov. 1966
Fukui Prefectural Institute of Public Health was transferred to Machiya-cho, Fukui (present Bunkyo 1-chome, Fukui)
-
Feb. 1969
Fukui Environmental Radiation Monitoring Council was established.
-
Apr. 1969
Fukui Prefectural Nuclear Safety Management Council was established.
-
Oct. 1969
Tsuruga Nuclear Power Plant No.1 went critical.
-
Nov. 1972
Fukui Prefectural Institute of Public Health was transferred to Harame-cho, Fukui.
-
Apr. 1973
The Radioactivity Department was established in the Fukui Prefectural Institute of Public Health.
-
Oct. 1976
The Environmental Radiation Monitoring Center was established in the Fukui Prefectural Institute of Public Health.
Environmental Radiation Monitoring Telemetry System started operation.
(Continuous monitoring of the environmental radiation was started.)
-
Mar. 1991
The Radioactivity Monitoring Building (present Fukui Analytical Management Office Building) was constructed in the Fukui Prefectural Institute of Public Health.
-
Mar. 1995
New building was constructed in Yoshiko, Tsuruga (present Fukui Environmental Radiation Research and Monitoring Center Tsuruga Yoshiko site)
-
Apr. 1995
Nuclear Power Plant Environmental Information Network System started operation. (Collecting the information of the nuclear power plant operation and of the environmental monitoring by nuclear facility operators was started.)
-
May. 1995
Fukui Prefectural Environmental Radiation Research and Monitoring Center became independent of the Institute of Public Health.
-
Apr. 1997
The Environmental Radiation Monitoring Telemetry System was replaced. (The connection with the Nuclear Power Plant Environmental Information Network System was done to share the monitoring data, and sub monitoring stations were expanded from 5 points to 11.)
-
Apr. 2000
Collecting the stack gas monitor data was started at the Nuclear Power Plant Environmental Information Network System.
The Prefectural Office Sub Monitoring Station was opened at the Prefectural Office Hall.
-
Apr. 2001
Fukui Prefectural Environmental Radiation Research and Monitoring Center Web Site was opened.
Emergency monitoring equipment was provided in the Nuclear Emergency Response Operation Facility (Offsite Center) which was constructed newly in four places of Fukui Prefecture.
-
Apr. 2005
Sub monitoring station and web site was renewed.
The Environmental Radioactivity Monitoring Database System was replaced.
-
Apr. 2008
Improved the Fukui prefectural telemeter system for environmental
radiation monitoring. (Integrated the nuclear power environmental information network system.)
-
Apr. 2012
5 prefectural monitoring stations were newly estblished.
-
Apr. 2013
21 prefectural monitoring stations were newly established.
The web site was renewed (for data disclosure of newly-built stations, and so on).
Monitoring data display units were provided instead of sub monitoring stations. (11 points were added to the existing 12 sub-monitoring stations)
-
Apr. 2015
Emergency power generators at 39 prefectural monitoring stations were newly estblished.
-
Emergency power generators
-
2012-2015
12 monitoring stations (Concrete building type) were renewed.
-
Apr. 2016
55 Monitoring Station Using Electronic Dosimeter with Data Transmission Facility were newly estblished.
-
Apr. 2017
The Environmental Radioactivity Monitoring Database System was replaced.
-
Apr. 2018
Information platform and Publishing System was replaced.